期刊文献+

基于BIM的综合管线深化设计流程初探 被引量:8

Primary exploration of integrated pipeline deepening design process based on BIM
下载PDF
导出
摘要 通过简述BIM的特点,以广州番禺供电局生产调度综合楼项目为例,详细阐述了BIM在管线深化设计中的实践及应用经验,并提出管线深化设计过程中BIM应用的基本流程,同时对BIM在管线安装阶段的应用进行了尝试,为进一步推动BIM在建筑业的应用提供参考借鉴。 Through briefly describe the characteristics of BIM, taking Guangzhou Power Supply Bureau of Panyu production scheduling complex building project as an example, elaborated practical and application experience of BIM in the deepening design of the pipeline. In addition, put forward the basic application workflow of the BIM in pipeline deepening design process. Finally, the application of BIM in pipe installation phase was attempted, it has a reference significance to further promote the development of BIM and architecture industry.
出处 《山西建筑》 2015年第4期96-98,共3页 Shanxi Architecture
关键词 BIM 管线综合 流程 建筑业 BIM, pipeline, process integrated, architecture industry
  • 相关文献

参考文献4

二级参考文献6

共引文献180

同被引文献48

引证文献8

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部