摘要
结合某市政公路下穿某城际铁路的工程地质水文条件,对该工程的主体结构作了介绍,着重对该工程封闭式路堑的设计进行了研究,阐述了U型槽基底加固、开挖及止水帷幕的技术措施,以实现施工零沉降的目标。
Combining with the hydrological conditions of one municipal road under-crossing intercity railway engineering, the paper introduces the major engineering structure, studies the design of closed road cutting, and describes technological measures of U-shape groove foundation rein- forcement, excavation and waterproofing curtain, with a view to avoid construction subsidence.
出处
《山西建筑》
2015年第4期132-133,共2页
Shanxi Architecture
关键词
城际铁路
沉降
路堑
降水
立交工程
intercity railway, subsidence, cutting, precipitation, interchange engineering