分析了杭州市清江路立交桥钢梁架设施工中的重难点,主要介绍了该立交桥B9号-B12号墩钢梁架设过程中的支墩安装、钢梁吊装焊接、对位调整及体系转换等施工要点,为今后钢梁架设积累了经验。
The paper analyzes the main points and difficulties of the steel truss erection of B9 - B12 pier of passover along Qingjiang road in Han- gzhou, mainly introduces the construction points for the pier installation, welding of beam truss hoisting, counterpart adjustment, and system transfer, so as to accumulate construction experience for following steel truss erection.
出处
《山西建筑》
2015年第4期169-170,共2页
Shanxi Architecture
关键词
钢梁安装
支墩
对位调整
体系转换
steel truss installation, pier, counterpart adjustment, system transfer