摘要
结合工程实例,介绍了建设项目的特殊性,对限额设计的全过程进行了分析,阐述了限额设计成功实施的关键要素,并提出了一些特殊项目限额设计的应对措施,为解决相关问题提供了思路。
Combining with engineering examples, the paper introduces the specialty of construction project, analyzes whole quota design process, describes critical quota design implementing factors, and puts forward countermeasures of special project quota design, which has provided some concept for solving relevant problems.
出处
《山西建筑》
2015年第4期229-230,共2页
Shanxi Architecture
关键词
限额设计
项目
测算
资料
quota design, project, calculation, data