摘要
本文对混凝土池在稀泥、流砂等地质条件上的沉降施工与传统大开挖施工进行了比较,对沉降施工与大开挖施工方法进行了探讨,实现了相关的经济效益。
In this paper, comparing between set lement construction and traditional large excavation construction about concrete pool construction in the different geological conditions such as mud, sand flow is made in this paper. Methods for set lement construction and large excavation construction are discussed as wel , which implements the related economic benefits.