摘要
建筑工程里面的三边工程就是指边勘测、边设计、和边施工。这类工程通常采用网络图法进行计划管理,可以显著缩短建设项目的周期。本文对三边工程的设计和勘测、设计和施工以及勘测和施工进行平行推进的工程管理方法进行了探讨。
The trilateral engineering in construction project is refers to the edge of reconnaissance, design, and construction. Such projects usual y adopt the method of network chart to plan and manage, which can significantly shorten the construction period. This paper discusses the engineering management methods which paral el proposes the design and survey, the design and construction and the survey and construction of trilateral engineering.
出处
《城市建筑》
2014年第18期256-256,共1页
Urbanism and Architecture
关键词
三边工程
管理方法
建设周期
trilateral engineering, management approach, construction cycle