期刊文献+

基于总入流概念的鄱阳湖设计洪水计算 被引量:3

Design flood calculation of Poyang Lake based on concept of total inflow
下载PDF
导出
摘要 由于受到江河湖槽自然演变和人类活动的影响,鄱阳湖出湖控制站实测资料无法满足一致性和可靠性要求,再加上湖区水情复杂、观测资料匮乏,导致设计洪水计算面临较大困难。基于入库洪水理论,引入了总入流的计算方法,对于湖区各支流控制站和无控区间来水的流量过程,只考虑传播时间的叠加,避免了对各种自然、人为因素影响的定量计算,计算结果真实反映了洪水量级与时程分配过程,满足设计洪水计算规范要求。计算成果可为鄱阳湖区综合规划、水利枢纽设计提供依据。 Under the influence of natural evolution of rivers and lakes and human activity, the measured data of controlling sta-tion at outlet of Poyang Lake ( Hukou Hydrological Station) can not meet the demand of consistency and reliability. Moreover, the water regime of the lake area is complicated and the measured date is scare, so the design flood calculation is difficult. There-fore, on the basis of reservoir flood theory, the calculation method of total inflow was introduced. For the runoff of the hydrologi-cal station at tributaries and in the area lack of controlling station, only the propagation time superposition was considered, so as to avoid the influential factors. The calculation result can reflect the actual flood magnitude and temporal-spatial distributions, and it fulfills the demand of flood calculation standard.
出处 《人民长江》 北大核心 2015年第1期58-60,共3页 Yangtze River
基金 国家重点基础研究发展"973"计划"长江中游通江湖泊江湖关系演变过程与机制"(2012CB417001)
关键词 总入流 设计洪水 洪水还原计算 鄱阳湖 total inflow design flood Poyang Lake flood reduction calculation
  • 相关文献

参考文献5

  • 1水利部长江水利委员会.长江流域防洪规划报告[R].武汉:水利部长江水利委员会,2003.
  • 2水利部长江水利委员会.鄱阳湖区综合规划报告[R].武汉:水利部长江水利委员会,2010.
  • 3长江勘测规划设计研究有限责任公司,江西省水利规划设计院.鄱阳湖水利枢纽项目建议书[R].武汉:长江勘测规划设计研究有限责任公司,2010.
  • 4黄燕,徐高洪,沈燕舟,秦智伟,徐长江.平原水网区水资源量平衡分析方法研究[J].人民长江,2008,39(17):24-26. 被引量:8
  • 5徐高洪,秦智伟.鄱阳湖区间洪水计算方法[J].湖泊科学,1998,10(1):31-36. 被引量:5

二级参考文献4

共引文献8

同被引文献80

引证文献3

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部