向家坝水电站左岸高边坡开挖与支护施工技术 被引量:3

Construction technology of excavation and supporting of high slope at left bank of Xiangjiaba Hydropower Station
下载PDF
导出
摘要 向家坝水电站枢纽布置因受地形条件制约,需开挖左岸山体以满足二期导泄流建筑物、升船机上下游引航道布置条件。开挖后形成的高边坡地质条件复杂,且存在煤层采空区和煤洞,成为影响高边坡局部稳定的主要因素。为保证高边坡稳定及枢纽运行安全,需对其采取加固措施。经研究,高边坡处理采用了锚索、锚杆等常规支护措施,并对煤层采空区及煤洞进行了回填。处理后监测表明,左岸高边坡整体保持稳定状态。 The layout of hydro -complex of Xiangjiaba Hydropower Station is constrained by the topographic condition , the mountain body at left bank should be excavated for the layout of stage II diversion structure , upstream and lower stream approach channels of ship lift.The geological condition of the high slope formed by the excavation is complicated ;in addition, the mined-out area and coal holes exist , which are the main influential factors for the local safety of the slope .To ensure the stability of the high slope and the safety of the hydro -complex, reinforcement measures should be adopted .Through researches, the con-ventional support measures such as anchor cable and anchor rod are taken , and the mined-out area and coal holes are filled . The monitoring after the treatment shows that the high slope is in a stable state .
作者 樊凯
出处 《人民长江》 北大核心 2015年第2期40-43,共4页 Yangtze River
关键词 高边坡 煤层采空区 边坡开挖 支护工程 向家坝水电站 high slope mined-out area slope excavation supporting project Xiangjiaba Hydropower Station
  • 相关文献

参考文献5

  • 1中国水电顾问集团中南勘测设计研究院.金沙江向家坝水电站可行性研究报告(工程地质)[R].长沙:中国水电顾问集团中南勘测设计研究院,2003.
  • 2中国长江三峡工程开发总公司.金沙江向家坝水电站左岸主体及导流工程施工招标文件[z].北京:中国长江三峡工程开发总公司.2005.
  • 3中国水利水电第三工程局有限公司.金沙江向家坝水电站左岸高程300m以上边坡工程施工组织设计[R].西安:中国水利水电第三工程局有限公司,2004.
  • 4中国水电顾问集团中南勘测设计研究院.左岸边坡0+200.0m~O+270.0m、v340.0m-V370.0m煤层采空区处理方案的通知[R].长沙:中国水电顾问集团中南勘测设计研究院,2005.
  • 5中国长江三峡集团公司向家坝工程建设部.金沙江水电开发质量检查-高程300m以上边坡开挖支护及煤洞煤线处理施工质量报告[R].宜宾:中国长江三峡集团公司向家坝工程建设部,2007.

同被引文献8

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部