摘要 管道在穿越高速公路施工一般采用顶管,淮盐矿业管道穿过沿海高速的位置临近灌河大桥北侧,地质条件为海於泥,沿海高速建设时采用了水泥粉喷桩加固路基,施工中首次拖管失败,经过重新穿越再次拖管成功,现予以总结,以供类似工程参考。 Generally, the pipes cross highway usually use pipe jacking. The position of the pipes of Huaiyan Salt Mine crossing the highway is near to the north side of Guanhe bridge and the geological condition is sea sludge, when constructing the highway, cement powder spray pile is used to reinforce roadbed . The first drag pipe construction was failed and the second try get successful after re-crossing. This paper concludes the experiences for the references of colleagues.
作者 朱建华
出处 《中国井矿盐》 CAS 2015年第1期24-25,29,共3页 China Well and Rock Salt
关键词 钢管施工 公速公路 非开挖 海於泥路基 固井技术应用 Steel pipe construction, highway, conclude, sea sludge roadbed, well reinforcement technology