平朔东露天矿半连续工艺采掘方案研究

Research on several mining scheme of semi-continuous process during shift and production period in east open-pit mine
下载PDF
导出
摘要 对平朔东露天矿西工作帮1290平盘半连续工艺系统的组成和作业过程进行了介绍,主要对半连续工艺系统在移设期和正常生产期间,从经济和技术的角度,对半连续系统剩余爆量采掘方案和红粘土采掘方案进行了分析和探讨,并提出了合适的采掘方案,经过现场实践验证,该方案适合东露天矿半连续正常运行需要。 The article introduces the composition and operation process of 1290 flat semi-continuous process system in west working slope of east open-pit mine. During shift and normal production period, from economy and technology aspect, the article analyzes semi-continuous system surplus blasting amount mining scheme and red clay mining scheme, and presents suitable mining scheme. Through site practice verification, the scheme is suitable for semi-continuous normal operation in east open-pit mine.
作者 刘维玉
出处 《露天采矿技术》 CAS 2015年第1期19-21,共3页 Opencast Mining Technology
关键词 东露天矿 半连续系统 方案 east open-pit mine semi-continuous system scheme
  • 相关文献

参考文献7

二级参考文献10

共引文献145

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部