摘要
阐述重庆两江大桥工程施工过程中,结合工程结构特点,针对空间曲面索塔施工、钢桁梁制造安装及超大吨位钢绞线拉索安装张拉等施工关键技术所采取的管理和控制措施,并介绍两江大桥工程施工质量的总体控制效果。
This paper expatiates management and control measures adopted in combination of structural features of the project and in allusion of construction of spatial cambered cable towers, manufacture and installation of steel trusses as well as installation and intension of super large tonnage stranded wire cables, etc. , during construction of Chongqing tow river bridges, and introduces the overall effect of control for construction quality of Two-river Bridges Project.
出处
《公路交通技术》
2014年第6期122-126,共5页
Technology of Highway and Transport
基金
重庆市应用开发(重大)项目(cstc2013yykf C30001)
关键词
重庆两江大桥
施工
关键技术
管理
控制
Chongqing Two-river Bridges
construction
key technique
management
control