期刊文献+

Key technologies of precision demolition blasting of ultra-long urban viaduct in complicated surroundings 被引量:1

Key technologies of precision demolition blasting of ultra-long urban viaduct in complicated surroundings
下载PDF
导出
摘要 The key technologies of precision blasting were put forward based on the characteristics of urban via- duct blasting demolition in complicated surroundings. Initial bending instability mechanics model of reinforcing steel bar frame of blasting fragmented pier and sequenced collapsed dynamic model were established for quanti- tative blasting design. Technologies of water pressure blasting were applied in multi-cell box girder fragmenta- tion. The detonating network of non-electric duplication crossover was adopted for the safety and reliability of ultra-long delay. The rationality of blasting scheme and parameters were validated by physical model test. Harm- ful effects were forecasted and controlled by integrated protective technologies. Specialization, cooperation, pre- cision, execution (SCPE) project management method was put forward for precision management. The key tech- nologies of precision demolition blasting can provide reference for similar proiects.
出处 《Engineering Sciences》 EI 2014年第6期71-79,共9页 中国工程科学(英文版)
关键词 VIADUCT blasting demolition precision blasting instability model detonating network harmfuleffects control 水压爆破技术 爆破拆除 城市高架桥 环境 物理模型试验 精细化管理 力学模型 初始弯曲
  • 相关文献

参考文献1

共引文献6

同被引文献7

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部