百万千瓦机组塔式炉安装起重机械及场地布置 被引量:3

Hoisting machinery and site arrangement for installation of tower oven of million kilowatts unit
下载PDF
导出
摘要 华润彭城2×1 000 MW机组工程作为国家首批、江苏省第一台百万塔式锅炉机组工程,其场地小,重大型设备多,安装具有较高的难度,所以起重机械及场地的布置,将对塔式炉的安装起着决定性的作用。文中根据塔式炉的特点,科学合理进行起重机械及场地的布置,不仅顺利完成了塔式炉安装任务,而且为工程节约了大量资金和有力保证了最快工期的实现。 Huarun Pengcheng 2 × 1 000 MW unit project is the first batch in China,the first million-kilowatts unit tower oven in Jiangsu. Due to limited site area,too many pieces of large-scale equipment,and installation difficulty,hoisting machinery and site arrangement plays an decisive role in installation of the tower oven. Based on characteristics of the tower oven,scientific and reasonable hoisting machinery and site arrangement introduced in the paper can not only complete the installation task of the tower oven,but also save large amount of engineering cost and guarantee completion within the construction period.
作者 吴德胜
出处 《起重运输机械》 2014年第12期101-106,共6页 Hoisting and Conveying Machinery
关键词 塔式锅炉 布置 起重机械 场地 tower oven arrangement hoisting machinery site
  • 相关文献

参考文献6

二级参考文献5

共引文献50

同被引文献7

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部