1Min-Yuan Cheng, Nhat-Duc Hoang, Yu-Wei Wu. Hy- brid intelligence approach based on LS-SVM and dif- ferential evolution for construction cost index estima- tion: a Taiwan case study[J]. Automation in Construc- tion,2013,35(11).
2James M W Wong, S Thomas Ng. Forecasting con- struction tender price index in Hong Kong using vec- tor error correction model[J]. Construction Manage- ment and Economics, 2010,28 (12).
3Shahandashti S M, Ashuri B. Forecasting engineering news-record construction cost index using multivariate time series models[J]. Journal of Construction Engi- neering and Management, 2013,139 (9).
4Fei-peng Li, Hong-li Wang. Study on forecast of Tian- jin construction cost indices based on ARIMA model [A]. Proceedings of 2012 3rd International Asia Con- ference on Industrial Engineering and Management In novation [C]. 2013.
5Xu J W, Moon S. Stochastic forecast of construction cost index using a cointegrated vector autoregression model[J]. Journal of Management in Engineering, 2013,29(1).
6AUSTIN D, MACAULEY M. A quality-adjusted cost index for estimating future consumer surplus from innovation[J]. Resources for the Future,1998,25(7) :32-38.