摘要
随着国家对环保要求的严格,原来老机组所用引风机已不能满足机组运行的要求,必须对引风机进行增容改造。本文对漳泽发电分公司215MW机组引风机增容改造方案、引风机选型及改造后出现的问题、改造后的经济性进行论述,已供大家参考。
With the state's more stringent environmental requirements, the original draft fan used in the old unit can not meet the requirements of normal operation, so the capacity-increase transformation of induced draft fan must be conducted. This article discusses the capacity-increase transformation program and selection of induced draft fan in Unit 215 MW of Zhangze Power Generation Branch Company,and explores the problems and the economy after the transformation, for reference.
出处
《价值工程》
2014年第25期60-61,共2页
Value Engineering
关键词
引风机
增容
改造
induced draft fan
capacity-increase
transformation