摘要
介绍了360m^2烧结机主抽风机高压变频系统的控制原理和启动过程,并针对运行中出现的问题进行分析和改进,特别是通过对风机启动失败故障的处理,提高了系统的稳定性和可靠性。
Present the control principle and startup process of the high-voltage frequency convesion system of the mail exhauster for 360m^2 sintering machine. Analyze the problem occurred in the operation and make an improvement. Through solving the startup failure of fan, the stability and reliability of the system is improved.
出处
《冶金设备管理与维修》
2015年第1期18-21,共4页
Metallurgical Equipment Management and Maintenance
关键词
烧结
主抽风机
高压变频器
改进
Sintering, main exhauster, high-vohage frequency converter, improvement