期刊文献+

堰塞湖减灾群决策的直觉模糊距离法 被引量:1

The Intuitionist Fuzzy Method of Group Decision for Barrier Lakes Disaster Relief
原文传递
导出
摘要 针对堰塞湖减灾群决策信息的不确定性与模糊性,为解决不完全信息条件下属性指标及专家之间存在的相互关联群决策问题,综合运用直觉模糊集理论、海明距离原理和熵权理论,将直觉模糊距离群决策方法运用到堰塞湖减灾决策过程中。工程实例研究表明,运用直觉模糊距离法决策出的最优方案具有较高的区分度和敏感性,增强了决策的客观性、科学性,能为堰塞湖减灾决策提供更为可靠的依据,具有较强的实用价值。 With the information uncertainty and fuzzy of barrier lake disaster relief group decision, to solve the correlation between the indicators and group decision experts under the condition of incomplete information, the paper integrated of intuitionist fuzzy sets theory, Harming distance principle and entropy theory to solve the problem of barrier lake disaster relief decision in the decision-making process. Case shows that intuitionist fuzzy distance methods have a higher degree of differentiation and sensitivity and enhance the objectivity, science of the decision-making, the model can provide reliable bases for the barrier lake disaster relief decision-making and has a strong practical value.
出处 《模糊系统与数学》 CSCD 北大核心 2014年第6期177-183,共7页 Fuzzy Systems and Mathematics
基金 国家自然科学基金资助项目(71372091)
关键词 直觉模糊距离 堰塞湖减灾 群决策 敏感性分析 Intuitionist Fuzzy Distances Barrier Lake Disaster Relief Group Decision Sensitivity Analysis
  • 相关文献

参考文献12

  • 1周宏伟,杨兴国,李洪涛,李书建,高星吉,乔路.地震堰塞湖排险技术与治理保护[J].四川大学学报(工程科学版),2009(3):96-101. 被引量:21
  • 2谭春桥,张强.基于直觉模糊距离的群决策专家意见聚合分析[J].数学的实践与认识,2006,36(2):119-124. 被引量:15
  • 3Cui P, et al. The 12 May Wenchuan earthquake-induced landslide lakes.. Distribution and prelinary risk evaluation [J]. Landslides,2009, (6) :209-223.
  • 4刘宁.唐家山堰塞湖应急处置与减灾管理工程[J].中国工程科学,2008,10(12):67-72. 被引量:21
  • 5Choo E U, Wedley W C. A common framework for deriving preference values from pair wise comparison matrices [J]. Computer & Operations Research, 2004,1 : 893- 908.
  • 6Fan Z P, Xiao S H, Hu G F. An optimization method for in-tegrating two kinds of preference information in group decision-making[J]. Computers & Industrial Engineering, 2004,46 : 329-335.
  • 7胡强,佘成学.仙岭水库土坝渗流稳定分析及除险加固措施[J].岩土力学,2004,25(3):503-506. 被引量:17
  • 8Ghobadi M H, Khanlari G R. Seepaproblems in the right abutment of the Shahid Abbaspour dasouthern Iran [J]. Engineering Geology, 2005,82 (2) : 119- 12.
  • 9Chai J R, Li S Y. Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pump measures[C]//Wieland M, Ren Q W, TAN J S Y. Proceeing of the 4th international conference on dam engineering-developments in dam engineering. London :Taylor & Franc Group, 2004 : 171- 175.
  • 10Sedat T. Treatment of the seepage problems at the Kalecik Da (Turkey)[J]. Engineering Geology,2003,68(3/4): 159-169.

二级参考文献36

  • 1赵平,李建强.基于多层次灰色决策模型的施工方案评价[J].基建优化,2007,28(6):198-199. 被引量:5
  • 2张有天 陈平 等.有自由面的渗流问题分析的初值流量法[J].水利学报,1998,(8):18-26.
  • 3何德林 佘成学.车坝水库沥青混凝土面板开裂原因的分析[A]..第7届全国岩土力学数值分析与解析方法讨论会论文集[C].大连:大连理工大学出版社,2001..
  • 4佘成学 熊文林.具有自由面的渗流计算中的逸出边界的一种处理方法[J].武汉水利电力大学,1995,:107-110.
  • 5刘宁.巨型滑坡堵江排险减灾的认识[R].“科学技术与抗震救灾”技术科学论坛主题报告.成都.2008.
  • 6杨兴国.“5·12”汶川大地震所形成堰塞湖抢险工程中的关键技术探讨[R].“科学技术与抗震救灾”技术科学论坛学术报告.成都.2008.
  • 7四川大学.都江堰市白沙河无人区枷担湾堰塞湖应急处理方案设计[R].2008.
  • 8杨兴国.唐家山堰塞湖泄流后现场检查报告[R].2008.
  • 9德阳市水利勘测设计研究院.石亭江上游堰塞湖评估报告[R].2008.
  • 10]四川大学.什邡市石亭江红松一级电站堰塞湖溃决洪水演进报告[R].2008.

共引文献74

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部