摘要
针对500 kV变电站主变压器冷控回路存在的设计缺陷,分析了该设计缺陷存在的风险。
Against 500 kV station cold control circuit transformer substation design flaws, this paper analyzed the risk of the design defects, and presented a targeted transformation principles and rehabilitation measures.
出处
《贵州电力技术》
2015年第2期47-48,共2页
Guizhou Electric Power Technology
关键词
大型电力变压器
冷控回路
large power transformer
cold control circuit