基于ANP和云模型的水电项目群资源冲突风险评估 被引量:21

Risk assessment of resource conflict in hydropower engineering programmes based on both ANP and cloud model
下载PDF
导出
摘要 为解决现有水电工程项目群风险评估方法在处理模糊性、随机性和指标相关性方面存在的不足,提高风险管理决策的科学性,首先界定水电项目群资源冲突风险的概念并分类,建立包括人员、设备、资金、主材、组织和环境6个一级指标及19个二级指标的风险评价指标体系。然后,采用网络层次分析法(ANP)确定每个指标的全局权重。最后,利用云重心评价法实现定性与定量评估的相互转换,并用云发生器描述水电项目群资源冲突风险状态。用所建立的风险评估方法对国内某水电项目群进行实例分析。结果显示,该水电项目群第一标段的资源冲突风险状态为偏轻,评估结果与实际情况基本相符。 To overcome the deficiency of the current risk-assessment methods in hydropower engineering programmes in terms of fuzziness, randomness, index relativity etc. and to optimize the decision-making in risk management, concepts of resource conflict risks in hydropower programmes were defined and classi- fied, establishing an index system of risk assessment consisting of 6 primary indexes ( personnel, equip- ment, capital, advocate material, organization and environment) and 19 secondary indexes. Then ANP was used to determine the global weight of each evaluation index. Finally transformation between qualita- tive and quantitative assessment was accomplished by using cloud barycenter evaluation, and risk condi- tions of resource conflict in hydropower programmes were described by using cloud generator. The estab- lished risk assessment method was then applied to the analysis of a hydropower engineering programme in China. The result shows that risk condition of resource conflict in the first bid section is slight, which is basically consistent with the actual situation.
出处 《中国安全科学学报》 CAS CSCD 北大核心 2014年第11期152-158,共7页 China Safety Science Journal
基金 国家自然科学基金资助(51379110)
关键词 风险评估 云重心 网络层次分析法(ANP) 水电项目群 资源冲突 risk assessment cloud barycenter analytic network process(ANP) hydropower engineering programme resource conflict
  • 相关文献

参考文献14

二级参考文献124

共引文献1002

同被引文献201

引证文献21

二级引证文献129

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部