黄河滩地液化砂层地质条件下承台围堰施工技术

Construction Technology of Pile Cofferdam under Liquefied Sand Layer Geology in Yellow River Beach
下载PDF
导出
摘要 利用东营黄河特大桥滩地承台施工为实例,针对黄河滩地粉细砂地质,含水量大,水位高、易液化等特点,设计合理的承台围堰施工方案。利用既有15米长螺旋钢管施工围堰,结合井点降水,不设置内支撑开挖的方案,实践证明,方案设计合理,安全可靠,有效缩短了工期,节约了施工成本。 Taking the pile cofferdam construction of Dongying Yellow River bridge beach for instance, according to the characteristics of Yellow River beach including silty sand geology, large content of water, high water level and easy liquefaction, reasonable pile cofferdam construction method is designed. The existing 15m spiral steel tube is used for the cofferdam construction combined with well dewatering without internal support. Practice shows that the method is reasonable and safe, which shortens the construction period and saves cost.
作者 刘爱贤
出处 《价值工程》 2015年第10期147-148,共2页 Value Engineering
关键词 黄河滩地 液化砂层 地质 围堰 Yellow River beach liquefied sand layer geology cofferdam
  • 相关文献

参考文献3

二级参考文献4

  • 1伍亭垚.新光大桥主桥5^#墩大直径桩基施工[J].中外公路,2006,26(2):115-117. 被引量:3
  • 2[2]杨文渊,徐犇.桥梁基础施工工程师手册[M].北京:人民交通出版社,2001.75~76
  • 3[3]建筑施工手册编写组.建筑施工手册(上册)[M].第2版.北京:中国建筑工业出版社,1988.1017~1028
  • 4JTJ024—85.公路桥涵地基与基础设计规范[S].[S].,1985..

共引文献313

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部