期刊文献+

PPP项目谈判过程中信任的影响因素研究——基于扎根理论 被引量:13

Study on Trust-influencing Factors in the Process of PPP Project Negotiation——Based on Grounded Theory
下载PDF
导出
摘要 运用扎根理论研究方法,分析访谈中获取的资料记录,发掘PPP项目谈判过程中影响信任的9项因素,分为交易双方固有特征、交易双方交互行为与交易双方心理契约3大类别,构建PPP项目谈判过程中信任的影响因素及其作用机理模型。研究发现,在PPP项目谈判过程中,"响应性"与"沟通"直接影响信任的维持、提升与下降,其他各因素均通过"响应性"与"沟通"间接影响信任的演化。 With the application of grounded theory, this paper uncovered nine trust - influencing factors in PPP project ne. gotiation process by analyzing the obtained interview records, which can be classified into three categories: inherent charac- teristics, interactions and psychological contracts of two parties. The functional mechanism model for those factors was built finally. This paper also found that in the process of PPP project negotiation, the " responsiveness" and the " communica- tion" between two parties had a direct effect on maintaining, improving or setting back the trusts, while others were impos- ing partial influence indirectly.
出处 《科技管理研究》 CSSCI 北大核心 2015年第4期187-192,共6页 Science and Technology Management Research
基金 国家自然科学基金项目"PPP项目中信任的动态演化机理研究:基于政府部门的视角"(71372110) "回购式契约视角下政府对BT项目的投资控制研究"(71002066)
关键词 PPP项目 谈判 信任 扎根理论 PPP negotiation trust grounded theory
  • 相关文献

参考文献24

  • 1亓霞,柯永建,王守清.基于案例的中国PPP项目的主要风险因素分析[J].中国软科学,2009(5):107-113. 被引量:516
  • 2TSERNG H P,RUSSELL J S,HSU C W,et al.Analyzing the Role of National PPP Units in Promoting PPPs:Using New Institutional Economics and a Case Study[J].Journal of Construction Engineering and Management,2011,138(2):242-249.
  • 3YONGQING LI,WEI LI.The cooperative obstacles and countermeasures in partnering model based project management.
  • 4YANG L,SHUAI C.Trust,Contract Control and Project Performance in Construction Projects:an Empirical Study in China[J].Advances in Information Sciences and Service Sciences,2012,4(7):78-79.
  • 5DOLOI H.Empirical analysis of traditional contracting and relationship agreements for procuring partners in construction projects[J].Journal of Management in Engineering,2013,29(3):224-235.
  • 6AHADZI M,BOWLES G.Public-Private Partnership and Contract Negotiation:an empirical study[J].Construction Management and Economics,2004,22(9):967-978.
  • 7CHEUNG S O,YIU T W Y,YEUNG S F.A study of styles and outcomes in construction dispute negotiation[J].Journal of Construction Engineering and Management,2006,132(8):805-814.
  • 8YIU T W,CHEUNG S O,CHOW P T.Logistic regression modeling of construction negotiation outcomes[J].Engineering Management,IEEE Transactions on,2008,55(3):468-478.
  • 9XUE XIN,SHEN Q,REN Z,et al.Cognition and Decision Making in Construction Engineering and Management:A Case of Construction Project Contract Negotiation[J].Journal of Convergence Information Technology,2011,6(3):56-58.
  • 10MUELLER J S,CURHAN J R.Emotional intelligence and counterpart mood induction in a negotiation[J].International Journal of Conflict Management,2006,17(2):110-128.

二级参考文献43

共引文献589

同被引文献132

引证文献13

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部