LTE通信基站市电引入设计中应该考虑的问题 被引量:2

Design Considerations of Mains Connection for LTE Communication Base Station
下载PDF
导出
摘要 LTE通信基站市电引入的设计是基站建设的首要环节,直接关系到基站供电的可靠性和安全性,对通信网络的安全运行起到关键的作用。基站市电引入的设计多数由施工单位自行设计施工,造成基站市电引入方式出现较混乱的局面,不合理的设计施工会造成巨大的经济损失。做好基站市电引入设计,使市电引入方式合理化、简单化,在加大可靠性和安全性的基础上,降低投资成本,减少维护量能保障通信畅通,提高经济效益。 Mains connection design for the LTE communication base station is a primary step in base station construction,which plays a key role in safe operation of the communication network.However,the situation in this field is somewhat in chaos because of uncontrollable design and construction which will result in huge economical losses.Therefore,designing mains connection in a simple and reasonable manner can not only increase reliability and safety but also reduce investment costs and demand for maintenance which will guarantee regular communication and enhance economical benefits.
作者 修丽
出处 《通信电源技术》 2014年第6期96-98,共3页 Telecom Power Technology
关键词 市电引入 直流远供 地埋敷设 架空敷设 mains connection DC remote supply buried wire overhead wire
  • 相关文献

参考文献3

  • 1YD5137-2005.本地通信线路工程设计规范[S].2005.
  • 2YD5148-2007.架空光电缆杆路工程规范[S].2007.
  • 3YD/T1817-2008.通信设备用直流远供电源系统[S].2008.

同被引文献7

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部