某水电站溢洪道牛腿与大坝碾压混凝土整体上升施工方案 被引量:1

Overall Rising Construction Scheme of Spillway Corbel and Dam Roller Compacted Concrete for Yangjiayuan Hydropower Station
下载PDF
导出
摘要 杨家园水电站位于贵州省习水县二郎乡,地处赤水河一级支流桐梓河下游河段。水电站大坝为碾压混凝土椭圆双曲拱坝,最大坝高66 m,坝底厚18.5 m,坝顶厚5 m,厚高比0.28,坝顶中心线弧长150.8 m,碾压混凝土浇筑量约7.2万m3。文章介绍了杨家园水电站碾压混凝土拱坝在施工过程中,提出的针对溢洪道牛腿部位与大坝整体上升的施工方案,达到了缩短工程工期、保证施工安全的效果。 Yangjiayuan Hydropower Station is located in Erliang Township, Xishui County, Guizhou Province, on the downstream of Tongzi River which is the first tributary of Chishui River. Roller compacted concrete dam is elliptic hyperbolic roller compacted concrete arch dam, the maximum dam height is 66m, the base of the thickness is 18.5m, dam crest 5 m thickness, thickness ratio of 0.28, the center line of the arc length 150.8 m, RCC was about 72 000 m^3. This paper introduces overall rising construction scheme of spillway corbel parts and dam in the Yangyuan Hydropower Station during RCC arch dam construction, so as to shorten the construction period, guarantee the safety of construction.
作者 曹军
出处 《黑龙江水利科技》 2014年第11期43-45,共3页 Heilongjiang Hydraulic Science and Technology
关键词 碾压混凝土拱坝 溢洪道牛腿 整体上升 T型预制模板 施工方案 RCC arch dam spillway corbel overall rise T type prefabricated formwork construction scheme
  • 相关文献

参考文献1

二级参考文献2

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部