江苏海上风电接入系统若干问题探讨 被引量:12

A Discussion on the Integration of Offshore Wind Farm into Jiangsu Power Grid
下载PDF
导出
摘要 结合江苏近阶段开发建设的海上风电场项目,介绍了海上风电接入系统并网的电压等级、并网回路数的选择原则,讨论了长距离海缆并网的大型海上风电场输电系统的无功平衡、内部过电压限制措施,并通过工程实例,探讨了一种解决大型海上风电场接入系统后引起电网电压波动的无功补偿配置容量计算原则及方法。 Combining with the last constructed offshore wind power farm in Jiangsu Province, the selecting principles of integrating voltage level and number of connecting circuits are introduced. The reactive power balance and the court-measures for inner over-voltage of large-scale wind farm connected to the power grid through a long distance transmission line are discussed. Based on an engineering project, a method for reactive compensation capacity calculation for large-scale offshore wind farm is proposed.
作者 陆燕 谈健
出处 《江苏电机工程》 2014年第5期55-58,共4页 Jiangsu Electrical Engineering
关键词 海上风电 并网电压等级 高压海缆 无功平衡 内部过电压 无功补偿容量 offshore wind farm access voltage HV submarine cable reactive power balance inner-overvoltage reactivecompensation capacity
  • 相关文献

参考文献4

  • 1中国国家标准化管理委员会.GB/T19963--2011风电场接入电力系统技术规定[S].北京:中国标准出版社,2011.
  • 2国家电网公司.Q/GDW392--2009风电接入电网技术规定[S].
  • 3电力工业部电力规划设计总院.电力系统设计手册[M].北京:中国电力出版社,2005.
  • 4电力工业部.DL/T620-1997交流电气装置的过电压保护和绝缘配合[S].北京:中国电力出版社,1997.

共引文献6

同被引文献84

引证文献12

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部