摘要
研究目的:针对铁路多专业集成BIM设计系统因大数据渲染效率低下出现的响应迟缓和用户界面停滞问题,研发CPU预剪除技术。通过CPU计算剪除一部分不需要渲染的铁路BIM设计模型,减少后续GPU计算需要处理的数据量,优化CPU和GPU的计算负载,达到提升系统运行速度、减少系统响应时间的目的。研究结论:(1)基于铁路BIM模型的空间分布规律,应选择使用R-树空间索引实现CPU预剪除;(2)在大饭铺至马栅铁路线BIM设计实验中,采用基于R-树空间索引的CPU预剪除技术后,铁路BIM设计系统的渲染效率提升幅度达170%~210%;(3)基于R-树空间索引的CPU预剪技术能够有效缓解铁路BIM设计系统中的大数据渲染压力;(4)该研究结果可应用于铁路多专业协同设计领域。
Research purposes: In order to deal with the problem that multidisciplinary integrated railway BIM design system appears slow to respond and stagnation of the user interface, due to inefficient large data rendering, pre - culling with CPU technology is developed. CPU cut off part of railway BIM models which don't need to render, reduces the amount of data for subsequent GPU computing, optimizes the CPU and GPU computation load, to enhance the system operation speed and reduce system response time. Research conclusions: ( 1 ) R - tree spatial index is selected to implement the pre - culling, considering the spatial distribution of railway BIM models. (2) A test with BIM design models of Dafanpu to Mazha Railway shows that, the pre -culling with CPU technology based on R -tree spatial index increases the multidisciplinary integrated railway BIkI design system~ rendering efficiency by 170% - 210%. (3) The pre -culling with CPU technology based on R- tree spatial index effectively alleviates the pressure of large data rendering. (4) The research results can be applied to railway muitidisciplinary collaborative design domain.
出处
《铁道工程学报》
EI
北大核心
2015年第2期22-26,共5页
Journal of Railway Engineering Society
基金
铁道第三勘察设计院集团有限公司科技开发项目(721211)
关键词
铁路BIM设计
多专业集成设计
大数据渲染
CPU预剪除
R-树空间索引
railway BIM design
multidisciplinary integrated design
massive data rending
pre - culling with CPU
R- tree spatial index