3Michael R.Wind generation presents interconnection challenges[J].North American Windpower,2006,2:55-58.
4IEEE P1547 Std.IEEE standard for distributed resources interconnected with electric power systems[S].2004.
5Bolik S M.Grid reqrirements challenges for wind turbines[C].4th International workshop on large scale integration of wind power and transmission networks for offshore wind farms,Billund,Denmark,2003.
6Electric Systems Consulting,ABB Inc..Integration of wind energy into the alberta electric system,prepared for the Alberta electric system operator[DB/OL].http://www.aeso.ca/market/6389.html,2004.
7E.ON Netz.Erg(a)nzende Netzanschlussregeln für Windenergieanlagen[S].2001.
8Chai Chompoo-inwai,Chitra Yingvivatanapong,Kittipong Methaprayoon.Reactive compensaton techniques to improve the ridethrough capability of wind turbine during disturbance[J].IEEE Trans on Industrv Applications,2005,41(3):666-672.
9Abbey C,Joos G.Effect of low voltage ride through (LVRT) characteristic on voltage stability[J].IEEE Trans on Industry Applications,2005,41(3):1-7.
10Bing Xie,Brendan Fox,Damian Flynn.Study of fault ride-through for DFIG wind turbines[C].IEEE International Conference on Electric Utility Deregulation,Restructuring and Power Technologies (DRPT2004),Hong Kong,2004.