期刊文献+

地铁深基坑不同施工进尺对邻近桥墩及下跨拱涵影响数值分析 被引量:1

Numerical Analysis of Influence of Different Excavation Footages in Metro Deep Foundation Pit on Adjacent Piers and Under Cross Culvert
下载PDF
导出
摘要 以重庆轨道环线渝鲁车站至五里店车站区间明挖段工程为背景,采用有限元软件ANSYS建立三维模型计算分析了不同开挖进尺对邻近桥墩及下跨拱涵的影响特性。分析结果表明:小进尺开挖对邻近桥墩及下跨拱涵的位移、应变影响较大进尺开挖小,更有利于控制邻近建筑物的变形。利用此计算分析结果,小进尺开挖可作为实际施工过程中控制邻近建筑物变形的措施之一。 Based on the cut--and--cover excavated section in the project of Chongqing rail transit circle line between Yulu Station and Wulidian Station, the article uses the finite element software ANSYS to set up a three--dimensional model to calculate and analyze the influence of different excavation footages on adjacent piers and under cross culvert. The results indicate that the influence of small excavation footage on adjacent piers and under--cross culvert's displacement and strain is smaller than that of large excavation footage, which is more beneficial for controlling the deformation of adjacent structures. Through the results of calculation and analysis, the article proposes that small excavation footage can be used as one of the measures for controlling deformation of adjacent structures in the process of the practical construction.
出处 《绿色科技》 2015年第2期253-255,259,共4页 Journal of Green Science and Technology
关键词 邻近桥墩 深基坑 下跨拱涵 不同开挖进尺 变形 adjacent piers deep foundation pit under cross culvert differerit excavation footages deformation
  • 相关文献

参考文献8

二级参考文献50

共引文献323

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部