摘要
结合GB 50411—2007《建筑节能工程施工质量验收规范》,分析了建筑工程中电线电缆在进场节能见证取样检测中的各项指标要求,并对检测机构出具的检测报告中存在的问题作了针对性的分析,使工程施工、工程监理、质量监督和质量管理等相关人员明确电线电缆进场节能检测的要求,以加强建筑节能工程的施工管理,统一建筑节能工程施工质量验收的要求。
Combining with GB 50411—2007,this paper analyzed the specifications of energy-saving sampling detection of the wire and cable entry in the construction projects. The problems of detection report which was provided by the detection mechanism,were analyzed,in order to make the technicians of engineering construction,engineering supervision,quality supervision,quality management,and other related personnel know energy-saving testing requirements of wire and cable entry. It can strengthen the construction management of building energy-saving project,and unify the requirements of the construction quality acceptance.
出处
《现代建筑电气》
2015年第1期9-12,共4页
Modern Architecture Electric
关键词
节能
见证取样送检
截面积
导体电阻值
检测报告
energy-saving
evidential test
sectional area
conductor resistance
detection report