期刊文献+

长江荆江河段河势控制工程建设实践与思考 被引量:3

Construction practice of river regime controlling projects of Jingjiang River and some thoughts
下载PDF
导出
摘要 为应对三峡水库蓄水后清水下泄对下游河段特别是荆江河段造成的不利影响,于2007~2011年,在荆江河段先后实施了两个河势控制应急工程项目。两个项目除采用干砌石护坡、水下抛石护坡等传统护岸技术外,还采用了土工格栅护坡、钢丝网石垫护坡、软体排护脚、混凝土铰链排等护岸工程新技术。通过工程的实施,确定了护岸脚槽的合理顶高程,检验了护岸工程新技术在荆江河段治理中的适用性。详细介绍了传统与新技术在护岸工程中的实施情况,可供同类工程参考。 To cope with the adverse impact of clean water release on lower river channels especially Jingjiang River after impoundment of Three Gorges Reservoir,two river regime controlling emergency projects have been implemented at Jingjiang reach during 2007 to 2011 successively. The new technology of geogrid slope protection,steel wire mesh and enrockment slope protection,flexible mattress and concrete hinge,etc. was adopted besides the traditional bank revetment method of dry stone and underwater riprap. Through the implement of the two projects,the reasonable top elevation of the trough at revetment foundation is determined and the adaptability of the new technology in regulation of Jingjiang reach is verified. The implement of the traditional and new technology is introduced.
出处 《人民长江》 北大核心 2015年第3期18-20,共3页 Yangtze River
关键词 河势控制 护岸技术 脚槽高程 滩面防护 荆江河段 river regime control bank protection works new technology trough elevation at revetment foundation protection of beach surface Jingjiang reach
  • 相关文献

参考文献4

二级参考文献7

  • 1余文畴.抛石护岸稳定坡度与粒径的关系[J].泥沙研究,1984,(3):71-71.
  • 2长江勘测规划设计研究院.长江荆江河段河势控制应急工程2006年度实施项目初步设计报告[R].武汉:长江勘测规划设计研究院.2006.
  • 3长江勘测规划设计研究院.长江荆江河段河势控制应急工程湖北段2009年度实施项目初步设计报告[R].武汉:长江勘测规划设计研究院,2009.
  • 4长江勘测规划设计研究院.长江荆江河段河势控制应急工程湖南段2009年度实施项目初步设计报告[R].武汉:长江勘测规划设计研究院.2009.
  • 5武汉大学,长江水利委员会水文局.三峡工程坝下游河床冲刷问题阶段性评估报告[R].武汉:武汉大学,长江水利委员会水文局.2008.
  • 6格依 沙莫夫.计算底沙的极限流速和输沙率用的公式[J].泥沙研究,1956,1(1).
  • 7李贞儒,陈媛儿,赵云.作用于床面球体的推力及举力试验研究,见:第二次河流泥沙国际学术讨论会论文集.北京:水利水电出版社.1983.

共引文献1

同被引文献36

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部