期刊文献+

充泥过程中土工织物管袋的受力和变形分析 被引量:5

Analysis of force and deformation of geosynthetic tube filling with slurry
下载PDF
导出
摘要 为充分认识大型土工织物充泥管袋受力和变形的时变特性,并为管袋设计提供计算依据,采用无量纲化的方法,推求土工织物管袋在充泥过程中,从管袋顶部压力为零(即自由充填)到大于零(即通过泵压充填阶段)的拉力、变形形状以及充填高度随时间变化过程的解答。结果表明:当采用密度为ρ的泥浆充填横截面周长为L的管袋时,从自由充填到泵压充填的临界充填高度为0.1L,单位长度充填体积为0.04L2,对应的管袋拉力为0.002 5ρg L2;管袋在达到临界充填高度后,需要持续增加泵压才能使其继续充填,所需泵压与管袋拉力均随充填高度呈非线性快速增长。 To understand the time-variant characteristics of force and deformation of large-size geosynthetic tubes filled with slurry and to provide a calculation basis for tube design,the tension,shape,and height of a geosynthetic tube during the filling process were calculated using the dimensionless method. Two working conditions during the filling process were considered: one was the free filling condition,under which the pressure at the top of the geosynthetic tube was zero,and the other was the pump filling condition,under which the pressure at the top of the geosynthetic tube was greater than zero. It was found that,when a geosynthetic tube with a perimeter of L was filled with slurry with a density of ρ,the critical filling height from the free filling condition to the pump filling condition is 0. 1L,the filling volume per unit length of the geosynthetic tube is 0. 04L2,and the corresponding tension of the geosynthetic tube is 0. 002 5ρg L2. After the critical filling height was reached,a continuous increase in the pump pressure was needed to maintain the filling process. Both the required pump pressure and the tension of the geosynthetic tube increase nonlinearly and rapidly with the filling height.
出处 《河海大学学报(自然科学版)》 CAS CSCD 北大核心 2015年第1期22-27,共6页 Journal of Hohai University(Natural Sciences)
基金 国家自然科学基金(51278171) 中央高校基本科研业务费专项(2014B04914) 高等学校学科创新引智计划(B13024)
关键词 土工织物管袋 无量纲化方法 管袋受力 临界充填高度 管袋变形形状 geosynthetic tube dimensionless method tube force critical filling height tube deformed shape
  • 相关文献

参考文献22

  • 1朱朝荣,束一鸣,姜俊红,汪军.管袋堤坝在水流作用下的稳定性模型试验[J].河海大学学报(自然科学版),2008,36(3):333-336. 被引量:8
  • 2范公俊,贾延权,王艳红.几种围堰施工技术在连云港滩涂区的应用[J].水利水电科技进展,2011,31(1):62-65. 被引量:24
  • 3杨智,袁磊,李淼,曹震,赵一骏.充泥管袋和模袋混凝土在堤防中的应用[J].水利水电科技进展,2000,20(2):44-46. 被引量:6
  • 4CHU Jian, GUO Wei, YAN Shuwang. Geosynthetic tubes and geosynthetic mats: analyses and applications [ J ]. Geotechnical Engineering Journal of the SEAGS & AGSSEA, 2011, 42( 1 ) : 56-65.
  • 5LAWSON C R. Geotextile containment for hydraulic and environmental engineering[ J ]. Geosynthetics International, 2008, 15 (6) : 384-427.
  • 6LEE E C, DOUGLAS R S. Geotextile tubes as submerged dykes for shoreline management in Malaysia[ J ]. Geotextiles and Geomembranes, 2012, 30: 8-15.
  • 7马燕.大型充泥袋结构在黄骅港一期工程引堤工程中的应用[J].港工技术,1999,36(4):21-24. 被引量:10
  • 8YAN Shuwang, CHU Jian. Construction of an offshore dike using slurry filled geotextile mats [ J ]. Geotextiles and Geomembranes, 2010, 28 (5) : 422-433.
  • 9YEE T W, LAWSON C R, WANG Z Y, et al. Geotextile tube dewatering of contaminated sediments, Tianjin Eco-City, China [J]. Geotextiles and Geomembranes, 2012, 31: 39-50.
  • 10LESHCHINSKY D, LESHCHINSKY O, LING H I, et al. Geosynthetic tubes for confining pressurized slurry: some design aspects [ J ]. Journal of Geotechnical Engineering, ASCE, 1996, 122 (8) : 682-690.

二级参考文献59

共引文献76

同被引文献51

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部