黑龙江电网350MW汽轮发电机进相运行试验分析 被引量:1

Experimental analysis of leading phase operation of 350 MW turbine generator in Heilongjiang grid
下载PDF
导出
摘要 针对黑龙江电网在低负荷时电压偏高的现象,结合黑龙江某厂350 MW汽轮发电机的进相运行试验,分析了对厂用电设备的影响和调整系统电压应考虑的问题以及在实际运行中的解决方法。同时给出了发电机进相深度与低励限制的配合关系,确保了机组进相安全。 In view of the phenomenon that the Heilongjiang grid voltage is on the high side at low load, according to the test on leading phase operation of 350 MW turbine generator in a Heilongjiang power plant, the paper analy- zes the influence on house -service equipments and the problems which should be considered when adjusting sys- tem voltage and the solving method in the actual operation, and at the same time, gives the matching relationship between generator leading phase depth and low excitation limit, which ensures the safety of leading phase.
作者 穆兴华
出处 《黑龙江电力》 CAS 2015年第1期57-60,共4页 Heilongjiang Electric Power
关键词 汽轮发电机 进相运行 进相深度 turbine generator leading phase operation leading phase depth
  • 相关文献

参考文献5

  • 1DL/T1040-2007电网运行准则[S].中国发展与改革委员会,2007.
  • 2Q/GDV746-2012同步发电机进相试验导则[S].
  • 3DL/T843-2010大型汽轮发电机励磁系统技术条件[S].
  • 4盂凡超,吴龙.发电机励磁技术问答及事故分析[M].北京:中国电力出版,2008.
  • 5胡敏强.电机学[M].北京:中国电力出版社,2005.

共引文献14

同被引文献20

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部