期刊文献+

输油气站场综合风险评价技术研究 被引量:23

Research on comprehensive risk assessment technique of oil & gas transmission station
下载PDF
导出
摘要 为完善国内输油气站场综合风险评价技术,提出一种站场综合风险评价模型。该模型基于模糊集理论,重点对传统的RCM与RBI技术进行改进与完善。将故障(失效)后果划分为伤亡后果、经济损失、环境影响和无形损失;采用模糊推理系统代替原有的算法进行计算设备风险,将动设备与静设备的风险转换为统一标度,得到站场综合风险值;最后采用雷达图显示站内设备的风险分布状况。实例分析表明,所建立的综合风险评价模型能够有效地解决定性风险与定量风险的融合问题,可为输油气站场的风险管理提供决策依据。 A model of comprehensive risk assessment of oil and gas transmission station is proposed in order to im-prove the risk assessment technique of station. Based on fuzzy set theory, the model puts emphasis on the improve-ment of Reliability Centered Maintenance ( RCM ) and Risk-Based Inspection Technology ( RBI ) . Safety conse-quence, financial loss, environment implication and non-physical loss are taken as fault or failure consequence of facilities. Fuzzy inference system is applied to calculate risk of facilities instead of primary algorithm, which trans-fers the risk of rotary machine and static equipment into uniform standard. Lastly, risk distribution circumstance is shown by radar chart. Example verifies that qualitative and quantitative risk could be integrated reasonably by the model established and it could be decision basis for risk management in stations.
出处 《中国安全生产科学技术》 CAS CSCD 北大核心 2015年第1期138-144,共7页 Journal of Safety Science and Technology
基金 国家"十二五"科技支撑计划课题(2011BAK06B01-11)
关键词 输油气站场 风险评价技术 模糊推理系统 RCM RBI oil & gas transmission station risk assessment technique fuzzy inference system RCM RBI
  • 相关文献

参考文献9

二级参考文献68

共引文献139

同被引文献194

引证文献23

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部