摘要 新喀Koniambo项目安全管理团队在工作中不断钻研创新,以预先危险性分析法为指导,开发了JSA卡、DSTI卡、STO和Obs卡等安全检查工具用于现场安全监控,形成了项目独特的"一法三卡"管理模式,创造了连续两年无事故、无重伤的安全生产记录。以"一法三卡"的实施效果为研究对象,分析了卡片数量与可记录事件数量的对比关系,得出"一法三卡"实施管控效果越好,现场可记录事件发生率越低的结论。这一结论凸显了"一法三卡"在施工现场安全生产管控工作中的重要地位,为施工项目推行"一法三卡"提供了有力的实证论据。 The HSE team in project Koniambo at New Caledonia has kept constant innovation in daily work. Taking the PHA ( Preliminary Hazard Analysis) method as guidance, some tools, such as JSA, DSTI, STO cards & Obs cards, etc. , have been developed for safety controlling in daily working. All of these have formed a unique man-agement mode "one method and three cards" in project, and it has brought a good effect of recording zero accident and zero serious injury for over two years. Taking the application effect of "one method and three cards" as study objects, the relationship between the quantity of cards and the quantity of recording events was analyzed. It showed that the better the controlling effects of cards, the lower the quantity of on-site recording events. This conclusion shows the importance of"one method and three cards" in safety controlling of construction field, and it is a demon-stration for popularizing in other projects.
出处 《中国安全生产科学技术》 CAS CSCD 北大核心 2015年第1期191-195,共5页 Journal of Safety Science and Technology
关键词 “一法三卡” 安全监控 滚动周期 "one method and three cards" safety controlling rolling cycle
  • 相关文献

参考文献7

二级参考文献31

共引文献44

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部