摘要 随着核电厂运行周期的增长,反应堆一回路窄量程温度探头特性会发生一定的漂移,一回路热工水力特性等因素的改变也将导致一回路平均温度加法器以及温度偏差加法器参数设置的不合理,需根据一回路温度探头交叉比较数据对一回路窄量程温度探头及其加法器进行修正。针对可能出现的交叉比较超差现象,提出了修正方法:一回路窄量程温度探头三点曲线拟合修正法和一回路平均温度加法器以及温度偏差加法器根据偏差量两点拟合修正法。从排除固有温度偏差因素,多工况权重系数法和横、纵向趋势比对3个方面提出优化和改进措施及方案。这些措施及方案措施及方案工程现场的应用证明了其可行性和有效性。 With the extension of the operation period, the characteristics of narrow range temperature probe will be drifting and aging in CPR1000 units. At the same time, the change of thermal hydraulic characteristics factors will also lead to the unreasonable setting of the parameters of average temperature summary and temperatuxe deviation summary. Therefore, it requires to modify the characteristics of narrow range temperature probe and the parameters of summary according to the cross comparison data. Aiming at the possible deviation, the modification method is put forward: the fitting modification method for three point curve of narrow range temperature probe and the fitting modification of two point curve of the average temperature summary and temperature deviation summary. And the optimization and improvement scheme is put forward, including excluding natural temperature deviation factor, weight coefficient in different operation conditions and horizontal / vertical trend comparison. These methods had been applied in the field, and were nroved to be feasible and effective.
出处 《核动力工程》 EI CAS CSCD 北大核心 2015年第1期108-112,共5页 Nuclear Power Engineering
关键词 温度探头 平均温度 温度偏差 Temperature probe, Average temperature, Temperature deviation
  • 相关文献

参考文献9

二级参考文献19

  • 1许以全,车济尧,苏云,曹学武.秦山一期核电站小破口冷却剂丧失初因严重事故以及缓解措施的研究[J].核动力工程,2004,25(6):546-549. 被引量:4
  • 2刘胜智,崔震华,张乃尧.用遗传算法构造压水堆核电站稳压器模糊控制规则库[J].核动力工程,2005,26(2):171-174. 被引量:7
  • 3MEYER C E.Improved load follow strategy for return-to-power capability[J].Nuclear Technology,1978,41:27-35.
  • 4BACHER P.Grey mode operation helps french PWRs to load follow[J].Nuclear Engineering International,1985,30:19-21.
  • 5MEHRDAD N K,MOHAMMAD B M,AMIR A S.A neural network controller for load following operation of nuclear reactors[J].Annals of Nuclear Energy,2002,29:751-760.
  • 6赵福宇 傅龙舟.反应堆负荷跟踪中氙瞬态响应的最优控制.核科学与工程,1988,8(4):293-303.
  • 7LIU Wenfeng,LUO Zhengpei,LI Fu,et al.The three-dimensional power distribution control in load following of the heating reactor[J].Annals of Nuclear Energy,2001,28:741-754.
  • 8CHEN Dengke,ZHANG Dafa.Study on optimal control method for load following operation of nuclear reactors[C]//2009 IEEE International Conference on Intelligent Computing and Inmlligent System.Shanghai:IEEE Press,2009:278-290.
  • 9蔡章生.船舶核动力装置汽机负荷扰动时堆芯动态响应特性.核动力工程,1986,7(4):47-54.
  • 10US Nuclear Regulatory Commission.Severe accident risks:An assessment for five US nuclear power plants:NUREG-1150[R].America:USNRC,1990.

共引文献55

同被引文献7

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部