期刊文献+

哈尔滨松浦公路大桥岩土工程勘察过程控制及效果 被引量:1

Control of Geotechnical Engineering Investigation Process for a Highway Bridge in Harbin and the Effect
下载PDF
导出
摘要 根据哈尔滨松浦公路大桥桥址自然地理条件和建筑设计要求参数,确定了该桥岩土工程勘察关键环节。阐述了勘察重点过程控制——水上平台勘探取样工艺要点,包括平台搭建、钻进及取心工艺、泥浆护壁、样品保管等。根据勘察成果,对桩基承载力及沉降进行了计算,给出了推荐桩型。 Based on the natural geographical conditions of Songpu highway bridge in Harbin and the parameters required by architectural design,the key links of the geotechnical engineering investigation are determined. The paper elaborates the control of key investigation processes including platform building,drill and coring technologies,mud protection and samples storage. Based on the investigation results,the calculation was made on the bearing capacity of pile foundation and ground subsidence,and the recommended pile type was presented.
出处 《探矿工程(岩土钻掘工程)》 2015年第2期69-73,共5页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 岩土工程勘察 水上钻探 取样 跟管钻进 泥浆护壁 松浦公路大桥 geotechnical engineering investigation drilling on water sampling drilling with casing mud protection Songpu highway bridge
  • 相关文献

参考文献8

二级参考文献29

共引文献39

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部