考虑用户定量需求的优质电力园区DVR优化配置 被引量:33

Optimal Configuration of DVR in Premium Power Park Considering Customers' Quantitative Demand
下载PDF
导出
摘要 优质电力园区是针对区域性高品质供电问题的一种有效解决方案,其中定制电力设备配置方案的确定是园区规划建设的重要内容。针对园区中动态电压恢复器(dynamic voltage restorer,DVR)的配置问题,提出一种考虑用户短时电压质量定量需求的DVR优化配置策略。基于过程抗扰时间和物理参数变化曲线,将用户对过程运行状态需求映射为短时电压质量需求,实现用户需求量化;以DVR投资最少为目标,满足用户需求为约束,建立DVR优化配置模型,用Tabu搜索算法求解,得到优化配置方案。对典型园区的仿真结果表明,该方法所得配置方案经济、可行,能在满足用户短时电压质量定量需求的同时,保证DVR投资最少。 Premium Power Park (PPP) is an effective technical solution to solve the regional high-quality power supply problems. The determination of custom device configuration is an important part of premium power park construction. Aiming at configuration of dynamic voltage restorer problem, this paper proposes an optimal configuration strategy considering customers' short-duration voltage variations quality demand. Based on process immunity time and physical parameters variation, mapping the demand of process running state to the demand of short-duration voltage variation quality, the customers' demand is quantified. Dynamic voltage restorer configuration optimization model is established by the constraints of meeting customers' short-duration voltage variation quality demand and the minimum cost is taken as the objective, DVR optimal configuration is derived by using Tabu search method. The proposed strategy is applied to a typical PPP and it is proved to be economical and feasible. The results show that this method can meet every customer's quantitative demand, meanwhile, ensure the minimum investment cost of DVR.
出处 《电网技术》 EI CSCD 北大核心 2015年第3期823-828,共6页 Power System Technology
基金 高等学校博士学科点专项科研基金资助项目(2013 0181110004)~~
关键词 优质电力园区 动态电压恢复器 过程抗扰时间 用户定量需求 优化配置 TABU搜索 premium power ,park dynamic voltage restorer process immunity time customers' quantitative demand optimal configuration Tabu search
  • 相关文献

参考文献17

  • 1Domijan A,Montenegro A,Keri A J F,et al.Simulation study of the world’s first distributed premium power quality park[J].IEEE Transactions on Power Delivery,2005,20(2):1483-1492.
  • 2郑颖,刘旭娜,刘阳,李铁牛,刘义伟.基于过程免疫时间和可接受后果状态的优质园区供电质量等级划分[J].电网技术,2014,38(1):211-216. 被引量:20
  • 3Delfantia M,Quaiab S.Analysis and comparison of premium power park performances[J].Electric Power Systems Research,2012,83(1):176-184.
  • 4Chan J Y,Milanovic J V,Delahunty A.Risk-based assessment of financial losses due to voltage sag[J].IEEE Transactions on Power Delivery,2011,26(2):492-500.
  • 5章雪萌,李国栋,徐永海,姚蜀军.基于预估的电压暂降技术经济评估[J].电网技术,2010,34(10):121-125. 被引量:13
  • 6成瑞芬,韩肖清,王鹏,秦文萍,张东霞.微电网动态电压恢复器运行模式研究[J].电网技术,2013,37(3):610-615. 被引量:21
  • 7Hirose K,Takeda T,Fukui A.Field demonstration on multiple power quality supply system in Sendai,Japan[C]//9 th International Conference on Electrical Power Quality and Utilisation,EPQU.Barcelona,Spain:IEEE,2007:9-11.
  • 8Farhoodnea M, Mohamed A,Shareef H,et al.Power quality improvement using an enhanced premium power park configuration//IEEE International Power Engineering and Optimization Conference (PEDCO).Melaka,Malaysia:IEEE,2012:129-134.
  • 9Meral M E,Teke A,Bayindir K C,et al.Power quality improvement with an extended custom power park[J].Electric Power Systems Research,2009,79(11):1553-1560.
  • 10盛晓光,韦统振,马明,霍群海.配电网中多台动态电压恢复器的优化配置研究[J].电网技术,2013,37(10):2991-2996. 被引量:18

二级参考文献105

共引文献95

同被引文献354

引证文献33

二级引证文献189

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部