尼拉姆-吉拉姆水电站为中国CGGC和CMEC联营体总承包的EPC项目,地下电站装机4台,总容量为963MW。介绍了巴基斯坦尼拉姆-吉拉姆水电站通风空调系统的设计工作,包括室外气象资料的收集、整编,通风空调系统设计参数的选择,阐述了设计思路和对策,为尼拉姆-吉拉姆流域其它水电站通风空调系统设计积累了经验。
Neelum-Jhelum Hydropower Station is an EPC project contracted by the joint venture of CGGC and CMEC.It is an underground power station,4 units are installed,with total installed capacity of 963 MW.This text introduces the design of HVAC system,including collection and compilation of outdoor meteorological data,and selection of HVAC system design parameters;and elaborates the design ideas and countermeasures,which provides experience for the design of other hydropower stations.
出处
《水利水电工程设计》
2015年第1期22-24,58,共3页
Design of Water Resources & Hydroelectric Engineering