期刊文献+

ZONGOⅡ水电站工程主副厂房建筑设计 被引量:1

Architectural Design of the Main and Auxiliary Powerhouses of ZONGO Ⅱ Hydropower Station
下载PDF
导出
摘要 在水电站的建筑设计中,如何合理地进行厂区总体布局,让各单体有序、协调联系在一起;如何合理进行建筑平面功能布局,做到功能分区明确,交通便捷;如何结合环境气候特点进行立面设计,展现现代工业建筑独特形象及丰富内涵;如何因地制宜地进行厂区绿化设计,达到良好的景观效果;针对ZONGOⅡ水电站主副厂房建筑设计对此进行了探讨。 According to the architectural design of main and auxiliary powerhouses of ZONGOII hydropower station,this text discuss how to reasonably arrange the powerhouse area so that individuals can combine orderly;how to make reasonable function layout of architecture plane to achieve clear functional partition and convenient transportation;how to make elevation design in combination with the environmental and climatic characteristics and show the unique image and rich connotation of modern buildings;and how to make greening design of powerhouse area suitable to the local conditions so as to achieve good landscape effect.
出处 《水利水电工程设计》 2015年第1期42-44,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 建筑布局 设计特点 节点设计 绿化设计 节能与环保 architectural layout design features node design greening design energy saving and environmental protection
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部