摘要
详细介绍了嘉陵江草街航电枢纽马鞍山人工砂石加工系统的设计与施工,包括系统布置、工艺流程、主要设备配置、电气系统以及建设过程等,可为类似工程参考。
This paper describes the design and construction of Maanshan artificial aggregate system for Jialing River Caojie navigation-power junction project, including the system arrangement, technological process, device configuration, electrical system, and construction process, etc., which can provide references for similar projects.
出处
《中国港湾建设》
2015年第2期33-36,共4页
China Harbour Engineering
关键词
人工砂石
加工系统
航电枢纽
artificial aggregate
processing system
navigation-power junction