摘要
船闸工程与传统的港口或船坞施工不同。针对船闸工程混凝土的结构特点与施工难点,采取了以高架门式起重机为主、其他多种形式为辅的混凝土施工技术,采取的综合施工措施,保证了施工强度和质量。
The construction of lock project is different from the traditional port or dock construction. Aiming at the concrete structural features and construction difficulties of the lock project, we used the concrete construction technology, which is mainly supported by the gantry crane and supplemented by other various forms. The comprehensive construction measure ensures the construction strength and quality.
出处
《中国港湾建设》
2015年第2期50-53,共4页
China Harbour Engineering
关键词
混凝土
施工技术
船闸工程
concrete
construction technology
lock project