期刊文献+

新疆油田气井排液采气工艺优选方法 被引量:13

Gas Well Liquid Drainage Gas Recovery Technology Optimization in Xinjiang Oilfield
下载PDF
导出
摘要 随着新疆油田气藏进入开发中后期,相当数量的气井已经出现井筒积液,严重影响了气井的正常生产。为使气井稳产,达到提高采收率的目的,研制了排液采气工艺技术优选图版。在新疆油田排液采气工艺初选的基础上,结合积液诊断精度较高的Coleman模型,以生产液气比和日产气量为横、纵坐标,绘制了新疆油田排液采气工艺优选宏观控制图。应用该图版对新疆油田积液气井的排液采气工艺进行优选,现场实施效果表明,该方法选择的工艺技术达到了使气井稳产,甚至增产的目的。 With the gas reservoir development of Xinjiang Oilfield entering into middle and late development stages,wellbore liquid loading is generated in considerable gas wells and greatly restricts the regular production of these wells. A liquid drainage gas recovery optimization chart is established to enhance gas recovery through maintain gas well stable production. Based on the primary optimization of liquid drainage gas recovery in Xinjiang Oilfield and accurate Coleman wellbore liquid loading diagnosing model,producing liquid- gas ratio and daily gas production rate are taken as x and y coordinates respectively to compile the liquid drainage gas recovery optimization macro chart of Xinjiang Oilfield. This chart is applied to optimize the liquid drainage gas recovery technologies of wellbore liquid loading wells of Xinjiang Oilfield. Field implementation demonstrates that the technologies chosen by this method effectively maintain gas well stable production,or even increase gas well production.
出处 《特种油气藏》 CAS CSCD 北大核心 2015年第1期141-143,158,共3页 Special Oil & Gas Reservoirs
基金 湖北省教育厅科技项目"产水气井分类管理的开发模式研究"(Q20141303)
关键词 气井 排液采气 井筒积液 临界携液流量 Coleman模型 新疆油田 gas well,liquid drainage gas recovery,wellbore liquid loading,critical liquid-carrying rate,Coleman model,Xinjiang Oilfield
  • 相关文献

参考文献6

  • 1James F Lea, Henry V N. Solving gas-well liquid-loading problems [ J ] . SPE - 72092 - PA, Journal of Petroleum Technology, 2004,56 (4) : 30- 36.
  • 2李世伦.天然气工程[M].北京:石油工业出版社,2000:15-36,229-256.
  • 3Turner R G, Hubbard M G, Dukler A E. Analysis and pre- diction of minimum flow rate for the continuous removal of liquids from gas wells [ C ] . SPE - 2198 - MS, SPE Gas Technology Symposium, Omaha, 1969 : 1475-1482.
  • 4Coleman S B, Clay H B, McCurdy D G. A new look at pre- dicting gas-well load-up[ J]. SPE-20280-PA,Journal of Petroleum Technology, 1991,43 ( 3 ) : 329- 333.
  • 5Li Min,Li S L,Sun L T. New view on continuous-removal liquids from gas wells [ C ]. SPE- 70016- MS, SPE Per- mian Basin Oil and Gas Recovery Conference, Midland, Texas, 2001 : 42- 46.
  • 6刘双全,吴晓东,吴革生,王效明,王选茹.气井井筒携液临界流速和流量的动态分布研究[J].天然气工业,2007,27(2):104-106. 被引量:51

二级参考文献5

共引文献57

同被引文献142

引证文献13

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部