表土层中地下走廊下穿铁路段变形数值模拟分析

Topsoil Underground Corridor through Railway Deformation Numerical Simulation Analysis
下载PDF
导出
摘要 针对东坡煤矿至刘家口选煤厂带式输送机输煤系统在平朔露天煤矿专用铁路K12+965处下方穿过的问题,采用数值模拟的方法,对皮带走廊初期支护条件下变形情况进行了数值模拟。计算结果显示,地下走廊暗挖施工穿越铁路专用线对铁路运营及地表变形影响甚微,完全在规范允许范围之内,分析结果对工程设计与施工有重要的指导意义。 For the problem of Dongpo Mine to Liujiakou Coal Preparation Plant conveyor coal transportation system crossing the below of Pingshuo Mine opencast special railway in K12 + 965, the method of numerical simulation was adopted, the deformation conditions of the belt corridor under the initial support were simulated. Calculation results showed that the underground corridor construction through railway sidings had little impact on railway and the surfaee deformation, completely in the range of specification, the analysis results had important guiding significance on engineering design and construction.
出处 《煤炭与化工》 CAS 2015年第1期49-51,共3页 Coal and Chemical Industry
关键词 地下走廊 下穿铁路 数值模拟 变形分析 underground corridor, through the below of railway numerical simulation deformation analysis
  • 相关文献

参考文献5

二级参考文献13

  • 1冯卫星,侯学渊,夏明耀.隧道施工引起地面沉陷的几何非线性分析[J].岩石力学与工程学报,1995,14(1):1-10. 被引量:14
  • 2施仲衡.地下铁路设计与施工[M].陕西科学技术出版社,-..
  • 3关保树 国兆林.隧道及地下工程[M].西南交通大学出版社,-..
  • 4高毓才.建设中的北京地铁[M].中国铁道出版社,-..
  • 5石礼安.上海大型市政工程设计与施工丛书:地铁一号线工程[M].上海科学技术出版社,-..
  • 6冯卫星,中国科协首届青年学术年会河北卫星会议论文集,1992年
  • 7张汝清,非线性有限元分析,1990年
  • 8龚尧南,结构分析中的非线性有限元素法,1986年
  • 9JTJ042-94.公路隧道施工技术规范[S].[S].,..
  • 10Lee K 1: Rowe R K Finite element modeling of the three-dimensional grounded formations due to tunneling in soft cohesive soils. Part-Method of analysis[J]. Computers and Geotechnics, 1990, 10: 87-109.

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部