摘要 针对矿井通风区域增加、通风富裕系数不足、通风路线加长、通风阻力增大的问题,通过对南井通风系统现状进行综合分析,提出了3个矿井通风系统改造方案。经过方案比较,选取在主井老风机东北侧安装主要通风机的方案。经网络解算,通风系统改造后能满足矿井需风量和通风阻力的要求,实现了通风系统稳定、安全可靠的目标。 Based on increasingly ventilation area, insufficient ventilation coefficient, ventihtion route extension, ventilation resistance increase problem, through the comprehensive analysis of ventilation system in Nanjing Mine, 3 transformation scheme of mine ventilation system was put forward. Through the comparison, the main fat machine was set in the northeast of main shaft. By internet calculation, the ventilation system after transformation met the needs of mine air quantity and air resistance, which realized the stable and reliable ventilation system.
作者 何飞
出处 《煤炭与化工》 CAS 2015年第1期124-127,共4页 Coal and Chemical Industry
关键词 矿井 通风系统 改造 优化设计 mine ventilation system transformation optimization
  • 相关文献

参考文献4

  • 1GB50399—2006,煤炭工业小型矿井设计规范[s].北京:中国计划出版社,2007.
  • 2GB50215-2005,煤炭工业矿井设计规范[s].北京:中国计划出版社.2005.
  • 3AQ1056-2008.煤矿通风能力核定标准[s].北京:煤炭工业出版社,2009.
  • 4AQ1028-2006.煤矿井工开采通风技术条件[s].北京:煤炭工业出版社,2007.

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部