3MALLOY K, STONE R, MEDLEY G, el al. Managed- Pressure driIling:what it is and what it is not[C]//paper 122281 MS presented at the IADC/SPE Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition, 12-13 February 2009, San Antonio, Texas, USA. New York : IADC/SPE, 2009.
4SANTOS H, REID P, MCCASKILL J, et al. Deepwater drilling made more efficient and cost-effective: using the microflux control method and an ultralow invasion fluid to open the mud weight window[J]. SPE Drilling & Completion,2007,22(3) : 189-196.
5SANTOS H, REID P, I.EUCHTENBERG C,et al. Microflux control method combined with surface BOP creates enabling opportunity for deepwater and offshore drilling[C]//paper 17451-MS presented at the Offshore Technology Conference, 2-5 May 2005, Houston, Texas, USA. New York: SPE, 2005.
6SANTOS H, MUIR K, SONNEMANN P,et al. Optimi zing and automating pressurized mud cap drilling with the micro-flux control method[C]//paper 116492-MS presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition,20-22 October 2008,Perth, Australia. New York: SPE,2008.
7CHUSTZ M J, SMITH I. D, DELI. DWAYNE. Managed pressure drilling success continues on Auger TLP[C]//pa per 112662-MS presented at the IADC/SPE Drilling Conference, 4-6 March 2008, Orlando, Florida, USA. New York: IADC/SPE, 2008.
8SANTOS H, LEUCHTENBERG C, SHAYEGI S. Micro flux control:the next generation in drilling process[C]// paper 81183-MS presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, 27-30 April 2003, Port of-Spain, Trinidad and Tobago. New York: SPE, 2003.