期刊文献+

挣值背景下的水利工程成本控制研究 被引量:1

Research on the Cost Control of Water Conservancy Engineering Setting in the Earned Value Theory
下载PDF
导出
摘要 在我国市场经济水平日益发展的背景之下,施工行业面临着更为激烈的综合能力竞争压力,将适当的成本控制理论应用于特定的工程项目会大幅提高施工单位的效率和利润。文章在对挣值理论进行研究的基础之上利用其对特定水利工程项目进行成本控制,并提出相应措施,通过计算比较控制前后成本和进度差异,对成本控制结果进行检验,最终得出结论,挣值理论可以有效的应用于水利工程施工项目,为我国其他领域的施工项目提供有效借鉴。 Under the background of the developing market economy in our country, the comprehensive competition pressure the construction industry faced is more and more fierce. Applying the appropriate cost control theory to the certain project will greatly improve the efifciency and proifts of the construction units. Based on the explanation of the earned value, the article use it to control the certain water conservancy engineering project, put forward some corresponding measures, and compare the difference of the cost and schedule before and after the control by calculating. and examine the results of the cost control. The conclusion is that the earned value can be effectively applied in water conservancy engineering construction projects, and it provides effectively reference for the other areas’ projects.
出处 《上海管理科学》 2015年第1期67-71,共5页 Shanghai Management Science
关键词 挣值理论 水利工程 成本控制 Earned Value Theory Water Conservancy Engineering Project Cost Control
  • 相关文献

参考文献7

二级参考文献25

  • 1陈嗣成 冯虹.《新编统计学原理》[M].北京经济学院出版社,1996..
  • 2Project Management Institute, A Guide to The Project Management Body of Knowledge, PMI Standard Committee, 2000.
  • 3Fleming, Quentin W., Cost/Schedule Control Systems Criteria: The Management Guide to C/SCSC, Chicago, Illinois: Probus Publishing Company, 1992.
  • 4Navy, Special Projects Office, Bureau of Ordnance, Department of the Nevy, Project PERT, Washington DC. 1958.
  • 5NASA, Office of the Secretary of Defense and National Aeronautic and Space Administration. DOD and NASA Guide PERT/COST, Washington, DC. 1962.
  • 6Fleming, Quentin W., and Joel M Koppelman, "Earned Value Project Management", Cost Engineering, Vol.39, No.2, Feberary, 1997.
  • 7Abba, Wanyne Y., "Earned Value Management—Reconciling Government and Commercial Practices: For People Involved in Earned Value—Government, Industry, Academic, or Consulting—These Are Exciting Times", PM: Special Issue, January-February, 1997.
  • 8Fleming, Quentin W., and Joel M. Koppelman, "Earned Value Project Management—A Powerful Tool for Software Projects" Crosstalk the Jounal of Deffence Software Engineering, July 1998.
  • 9Cass, Donald J., "Earned Value Program for DOE Projects", AACE-Ⅰ TRansactions-1998, 1998.
  • 10Abba, Wanyne Y., "Earned Value Management—Reconciling Government and Commercial Practices: For People Involved in Earned Value—Government, Industry, Academic, or Consulting—These Are Exciting Times", PM: Special Issue, January- February, 1997.

共引文献167

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部