摘要
针对平朔煤矸石电厂2×300MW循环流化床机组投运后存在的问题,提出优化方案。
According to the problems of operation of 2×300MW circulating fluidized bed unit of pingshuo gangue power plant, the optimization scheme is proposed.
出处
《自动化应用》
2015年第1期22-24,共3页
Automation Application
关键词
外置床
循环流化床
CCS
液阻
策略
external bed
circulating fluidized bed
CCS
liquid resistance
strategy