6C. Brunner. IEC 61850 Process conneetion-a smart solution to connect the primary equlpemnt to the substation automation system [C]. PSCC 2005 (15th Power System Computation Conference), Liege/Belgium, 22. 08-26. 08. 2005.
7RECHERD D, VICO J. Application of peer-to-peer communication, for protection and control, at Seward distribution and substation//Proceedings of 2005 58th Annual Conference on Protective Relay Engineers, Apt 5- 7, 2005, College Station, TX, USA. Piscataway, N J, USA: IEEE Computer Society, 2005: 40-45.
8IEC 61850 - 5 Communication networks and systems in substation. 2003.