摘要
唐阳煤矿236综放工作面上下顺槽均揭露落差较大断层(DF18:H=17m),对生产影响较大,为此,矿组织技术、劳资部门对方案的投入与效益进行认真分析,以确保效益的最大化,确定236综放工作面过DF18及分支断层采取两种不同方式。
The entries of Tang Yang coal mine 236 fully mechanized caving face exposed a fault with the larger fall(DF18:H=17m), which has a greater impact on production, in view of the current economic form, 236 fully mechanized caving face passing DF18 and branch fault take two different way, organized the technology and Labor Department to carry on the earnest analysis of the scheme input and efficiency, to ensure the maximization of benefit.
出处
《山东煤炭科技》
2015年第2期38-39,共2页
Shandong Coal Science and Technology
关键词
技术经济一体化
方案调整
分析
选择
integration of technology and economy
adjusting scheme
analysis
selection