摘要 核桃峪煤矿主斜井井筒施工时,要穿越多个涌水量较大的裂隙含水带,影响井筒正常施工。从经济和技术方案分析比较,决定采用工作面注浆堵水结合壁后注浆堵水的施工技术,同时对水泥、水玻璃在不同配比下的凝胶时间进行了大量实验,为注浆材料的选择提供了依据。实践证明,该技术注浆堵水效果良好,可为同类地质条件下的工程施工提供借鉴。 The construction of the main inclined shaft in Hetaoyu Coal Mine will pass through several water-bearing fractured zones with larger water inrush,which will affect the normal construction of the shaft. Through economic and technical analysis and comparison of the construction scheme,it was decided to adopt the construction technology of water-blocking by grouting from the heading face and the back of the wall,in the meantime,a number of experiments were made on the gel time with different proportioning of the cement and the water glass,which provided basis for the selection of the grouting materials. The practice indicated that this grouting technique for water-blocking has good effect and can provide reference for the engineering construction with similar geological conditions.
出处 《矿业安全与环保》 北大核心 2015年第1期105-108,共4页 Mining Safety & Environmental Protection
关键词 主斜井 井筒施工 含水层 注浆堵水 main inclined shaft shaft construction water-bearing layer grouting for water-blocking
  • 相关文献

参考文献4

二级参考文献1

共引文献15

同被引文献217

引证文献14

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部