针对向家坝水电站二次设备数量庞大、种类繁多、在厂内外分布范围广、安装工作相互穿插等问题,归纳总结了二次设备安装及调试过程中质量控制的关键环节,提出了向家坝水电站二次设备安装工程实施中的主要管理措施。
The installation of secondary equipment in Xiangjiaba Hydropower Station is rather difficult due to the large number,numerous types,and wide location of the secondary equipment,and also the intersection between installation processes. Thus,several key processes for the quality control of the installation and commissioning are summarized.Practical management measures are also presented for the installation of secondary equipment.